TXFlyGuy
Well-Known Member
Are there requirements to have a detailed log book entry for all items during Phase One? Such as accessories on the aircraft, or other items that are installed or removed for testing purposes?
My Ops Specs simply states a 12 month Conditional Inspection must be completed, with a log entry by a qualified person.
And, after Phase One is complete, a new log entry with the required info.
Is that all that is required?
__________________
My Ops Specs simply states a 12 month Conditional Inspection must be completed, with a log entry by a qualified person.
And, after Phase One is complete, a new log entry with the required info.
Is that all that is required?
__________________