HumanPoweredDesigner
Well-Known Member
Supposed I buy some square metal tubing for structural use, and I want to epoxy some square metal struts (walls) inside it every 8 inches. How could that be done without all the glue getting rubbed off before the piece is slid to the desired location? Would I just have to rub lots of glue in there and slide them in fast before it dries? Or do they have heat activated glue I could put in there wet and then heat once everything is in place?
Small plywood plugs would probably be easier to manipulate.
Small plywood plugs would probably be easier to manipulate.