How long is the process to receive airworthiness certification for Experimental classification?
 

TFF

Well-Known Member
Joined
Apr 28, 2010
Messages
14,345
Location
Memphis, TN
Once you have built it, as fast as you can get a FAA or DAR to come look at it and review the paperwork.
 

AirAttack

New Member
Joined
Dec 9, 2020
Messages
3
Thank you, TFF. That makes sense. I'm assuming I should still budget a month or two for everything to be processed?
 

Pops

Well-Known Member
HBA Supporter
Log Member
Joined
Jan 1, 2013
Messages
8,908
Location
USA.
I was ready in March 13, 2020 and because of the virus the FAA re-started inspections in July. My inspection was on July 7 , 2020. I started the N number request on Nov. 30, 2019.
 
Last edited:

TXFlyGuy

Well-Known Member
Joined
Apr 25, 2012
Messages
2,029
Location
Republic of Texas
How long is a piece of string?

Sorry for the wise remark! It all depends. Many, many variables. How long does it take to build an airplane?

My DAR spent over 6 hours with me during the inspection.
 

Pops

Well-Known Member
HBA Supporter
Log Member
Joined
Jan 1, 2013
Messages
8,908
Location
USA.
My FAA inspectors ( there was 2) spent about 3 hrs. They missed nothing on the airplane. I think they took more pictures than I have. Didn't want to see any building logs or any of the design work.
 

AirAttack

New Member
Joined
Dec 9, 2020
Messages
3
Awesome, thanks for those replies! I wasn't sure what to expect given the impact of COVID on timelines these days.
 

BJC

Well-Known Member
HBA Supporter
Joined
Oct 7, 2013
Messages
12,691
Location
97FL, Florida, USA
My TWTT Sportsman was totally open, and all the paperwork was on a table beside the airplane. Took about 2 1/2 hours. Note that the DAR had done many Sportsman airplanes before he did mine.