TURBINEONE
Member
We are very proud to announce the install of a New H80 850 HP GE Turbine in our Turbine VENOM
The very first experimental with a GE H80! Took two years of checkout.
Three engineering visits by GE and we only have 8 sqwaks to go!
The target is Oshkosh 2016 in the GE booth for world reveal.
Kit in stock and three sales slots for 2106 available.
Homeland Security and border patrol next.
The very first experimental with a GE H80! Took two years of checkout.
Three engineering visits by GE and we only have 8 sqwaks to go!
The target is Oshkosh 2016 in the GE booth for world reveal.
Kit in stock and three sales slots for 2106 available.
Homeland Security and border patrol next.